Answer to the question is (a) longest path. The critical path is determined by identifying all the possible paths and calculating their durations, and the one with the longest duration is identified as the critical path.
Explain how many paths are there?The number of paths can vary depending on the specific situation or system being analyzed.
The critical path is the longest path in terms of duration or time required to complete all its activities. It is the sequence of tasks or activities that must be completed in order to complete the project within the minimum possible time.
The critical path determines the total duration of the project, and any delay in the critical path activities will cause a delay in the project's completion time.
Therefore, the answer to the question is (a) longest path. The critical path is determined by identifying all the possible paths and calculating their durations, and the one with the longest duration is identified as the critical path.
The critical path method (CPM) is a popular technique used in project management to identify and manage the critical path.
Learn more about critical path.
brainly.com/question/16519233
#SPJ11
The angle of elevation from point A to the top of a hill is 49°. If point A is 400 feet from the base of the hill, how high is the hill? Round to the nearest tenth.
1. 460.1 ft
2. 301.9 ft
3. 262.4 ft
4. 459.3 ft
The height of the hill in the triangle is approximately 460.1 feet, which corresponds to option 1.
What is angle of elevation?Angles are used to define how an object is situated in respect to an observer. These angles include the angle of elevation and the angle of depression. The angle of elevation is the angle formed between the horizontal and a line connecting an item above eye level and the observer. In other words, it is the angle created while gazing up at an item from the ground. On the other hand, the angle of depression is the angle formed by the horizontal and a line drawn from the observer to an object that is below their level.
For the given triangle, applying the trigonometric function we have:
tan(49°) = h / 400
h = 400 * tan(49°) ≈ 460.1 ft
Hence, the height of the hill is approximately 460.1 feet, which corresponds to option 1.
Learn more about angle of elevation here:
https://brainly.com/question/16716174
#SPJ1
help me please like right now as soon as possible write the answer in terms of pi and round the answer to the nearest hundredths place I will give branliest
Thus, the total surface area of cylinder is found to be 480π sq. cm.
Explain about the surface area of cylinder:A cylinder's surface area is made up of its two congruent, parallel circular sides added together with its curved surface area. You must determine the Base Area (B) and Curved Surface Area in order to determine the surface area of a cylinder (CSA).
As a result, the base area multiplied by two and the area of a curved surface add up to the surface area or total surface of a cylinder.
Given data:
radius r = 8 cm
Height h = 22 cm
Total surface area of cylinder = 2*area of circle + area of curved cylinder
TSA = 2πr² + 2πrh
TSA = 2π(8)² + 2π(8)(22)
TSA = 2π(64) + 2π(176)
TSA = 128π + 352π
TSA = 480π sq. cm.
Thus, the total surface area of cylinder is found to be 480π sq. cm.
Know more about the surface area of cylinder:
https://brainly.com/question/27440983
#SPJ1
Complete question-
Find the surface area of the cylinder with radius of 8 cm and height of 22 cm. write the answer in terms of pi and round the answer to the nearest hundredths place.
The sum of three consecutive odd integers is fifty-seven. Find the
three numbers.
Therefore, the three consecutive odd integers are 17, 19, and 21.
What is equation?An equation is a statement that shows the equality of two expressions, typically separated by an equal sign. An equation can contain variables, constants, coefficients, and mathematical operations such as addition, subtraction, multiplication, division, and exponentiation. The goal of solving an equation is to find the value(s) of the variable(s) that satisfy the equality.
Here,
Let x be the first odd integer, then the second and third odd integers are x+2 and x+4, respectively, since the difference between consecutive odd integers is 2.
The sum of the three consecutive odd integers is 57, so we can write:
x + (x+2) + (x+4) = 57
Simplifying and solving for x, we get:
3x + 6 = 57
3x = 51
x = 17
To know more about equation,
https://brainly.com/question/28243079
#SPJ1
Nicky scored
18 points, 22 points, and 28 points in her
last three basketball games. How many
points does she need to score in her next
game to have a mean of 25 points per
game? Explain.
Answer:
To find out how many points Nicky needs to score in her next game, we can use the formula for the mean (also known as the average) of a set of numbers:
mean = (sum of all numbers) / (number of numbers)
We know that Nicky has played three games and scored, and points in them. So the sum of all her points is:
sum=18+22+28
sum=68
We also know that Nicky wants to have a mean of 25 points per game, and she has played three games already. If we add the score from her next game to the sum, we will have the total number of points she has scored in four games.
2. Find the area of the circle. Use 3.14 for r. Round to the nearest unit.
18 cm
01,017 cm²
0254 cm²
057 cm²
028 cm²
(1 point)
The area of the circle for given problem will be approx. 254 [tex]cm^2[/tex].
How to find the area of circle?The formula for finding the area of a circle is given by:
Area =[tex]\pi* r^2[/tex]
where "π" (pi) is a mathematical constant approximately equal to 3.14159, and "r" represents the radius of the circle.
Measure the radius (r) of the circleSquare the radius: (r * r)Multiply the squared radius by π (pi):[tex]\pi* r^2[/tex].The result is the area of the circle.Given,
Find the radius (r) of the circle. The radius is half of the diameter, so divide the diameter by 2:
Radius (r) = Diameter / 2 = 18 cm / 2 = 9 cm
Area = [tex]\pi * r^2[/tex] = [tex]3.14*(9 \;cm)^2[/tex] = [tex]254.34 \;cm^2[/tex] (rounded to two decimal places)
Learn more about Area of Circle here:
https://brainly.com/question/28642423
#SPJ1
Correct Question: Find the area of the circle with Diameter =18 cm(refer to image). Use 3.14 for π.( Round to the nearest unit).
What is the dividend yield on Stock A that sells at
$20/share, when Company A pays a quarterly
dividend of $0.10 per share?
dividend yield = [?] %
Give your answer as a percent rounded to the
nearest tenth.
The calculated value of the dividend yield on Stock A is 2%.
Calculating the dividend yield on the StockThe dividend yield is a ratio that indicates how much a company pays out in dividends relative to its stock price.
To calculate the dividend yield on Stock A, we need to divide the annual dividend per share by the stock price per share and then multiply by 100 to express it as a percentage.
Annual dividend per share = Quarterly dividend per share x 4
Annual dividend per share = $0.10 x 4 = $0.40
Now, we can calculate the dividend yield on Stock A:
Dividend yield = Annual dividend per share / Stock price per share x 100%
Dividend yield = $0.40 / $20 x 100%
Dividend yield = 2%
Therefore, the dividend yield on Stock A is 2%.
Read more about dividend at
https://brainly.com/question/30689455
#SPJ1
Please answer the question in the pdf. I just need the values for A, B, and C. I am offering 15 points. Thanks.
Recall the equation provided in the pdf:
(125x ^ 3 * y ^ - 12) ^ (- 2/3) = (y ^ [A])/([B] * x ^ [c])
find A B and C.
The answer will be:
A = 8/3B = 3/4C = 8/3Checkout the calculation of the exponentialWe can solve this problem using the rules of exponents and algebraic manipulation.
Starting with the left-hand side of the equation:
(125x^3 * y^-12)^(-2/3)
Using the rule that (a * b)^c = a^c * b^c, we can rewrite the expression as:
125^(-2/3) * x^(-2) * y^(8)
Simplifying further, we can use the fact that a^(-n) = 1/(a^n) to get:
1/(5^2 * x^2 * y^8/3)
Now, we can see that the denominator on the right-hand side of the equation must be 5^2 * x^2 * y^8/3. To find the numerator, we need to simplify the expression y^A. Comparing exponents, we see that:
y^A = y^(8/3)
Therefore, we need to find a value of A such that A = 8/3. Solving for A, we get:
A = 8/3
Now, we can write the equation as:
y^(8/3)/(5^2 * x^2 * y^8/3) = y^(8/3)/(25 * x^2 * y^(8/3))
Comparing exponents again, we see that we need to find values of B and C such that:
B * C = 2
and
-8/3 = -C
Solving for C, we get:
C = 8/3
Substituting this value of C into the first equation, we get:
B * 8/3 = 2
Solving for B, we get:
B = 3/4
Therefore, the solution is:
A = 8/3
B = 3/4
C = 8/3
Learn more about exponential algebra here:
https://brainly.com/question/12940982
#SPJ1
1. What is the sum of the first 1,000 positive multiples of 3, starting with 3?
1,001,000
1,499,998
500,500
1,501,500
By answering the presented question, we may conclude that As a result, arithmetic the total of the first 1,000 positive multiples of three beginning with three is 1,501,500. As a result, (C) 500,500 is not the right answer.
what is arithmetic progression?An arithmetic progression occurs when the difference between subsequent words in a series is always the same. The sequences 5, 7, 9, 11, 13, and 15 are examples of arithmetic progressions with a tolerance of 2. Arithmetic progression (A.P.) is a progression that has a set tolerance between any two successive numbers. There are two forms of mathematical progression: finite-length arithmetic series A finite geometric progression is a series with a finite number of terms. The series' terms may be used to calculate the early, late, tolerance, and number of terms.
The first positive multiple of three is three itself, followed by six, nine, and so on. As a result, the total of the first 1,000 positive multiples of three beginning with three is:
3 + 6 + 9 + ... + 3,000
S = (n/2)(a + l)
n = 1,000, a = 3, and l = 3,000 in this example (since the last term is 3 times the 1,000th term). When we enter these values into the formula, we get:
S = (1,000/2)(3 + 3,000)
S = 500(3,003) (3,003)
S = 1,501,500
As a result, the total of the first 1,000 positive multiples of three beginning with three is 1,501,500. As a result, (C) 500,500 is not the right answer.
To know more about arithmetic progression visit:
https://brainly.com/question/16947807
#SPJ1
Please help,, my teacher didnt show me how to do ths
Answer:
sorry did not mean to answer this
Step-by-step explanation:
Answer:
Domain: (0, ∞)
Range: (-∞, ∞)
Step-by-step explanation:
Domain solution: x > 0
Range solution: -∞ < f(x) < ∞
Hope this helps.
an x(bar) chart has a center line of 100, uses three-sigma control limits, and is based on a sample size of four. the process standard deviation is known to be six. if the process mean shifts from 100 to 92, what is the probability of detecting this shift on the first sample following the shift?
The probability of detecting this shift on the first sample following the shift would be 68.3%.
The probability of detecting can be calculated by taking the difference between the sample mean and the new process mean (92-100 = -8) and dividing it by the process standard deviation (6).
The result is -1.33, which is then used to calculate the probability of a sample mean falling within the three-sigma control limits.
The difference between the sample mean and the new process mean (92-100 = -8).
The difference by the process standard deviation (6).
The result is -1.33.
The number to calculate the probability of a sample mean falling within the three-sigma control limits.
The probability of detecting this shift on the first sample following the shift is 68.3%.For similar question on probability:
https://brainly.com/question/34187875
#SPJ11
a prism has three rectangular faces. its other faces are in the shape of
Answer: All the faces are rectangular.
Step-by-step explanation: A prism with three rectangular faces is called a rectangular prism. Therefore, the other faces are in the shape of rectangles.
The amount of time it would take you to go from Chicago to Las Vegas is equal to 1525 miles divided by your average rate of travel. Which equation describes how the time and rate of travel are related?
The equation that relates time and rate of travel is time = distance / rate, so for the given scenario, the equation would be time = 1525 miles / rate.
The equation that relates time and rate of travel is:
time = distance / rate
Where:
time is the time taken to travel the distance
distance is the distance between two places (in this case, from Chicago to Las Vegas)
rate is the rate of travel (the average speed)
So, for this specific case, the equation would be:
time = 1525 miles / rate
where rate is the average speed at which you travel from Chicago to Las Vegas.
Learn more about time here
brainly.com/question/2243052
#SPJ4
what is inches to feet
Answer: 12 inches is one foot
Step-by-step explanation: hope that this is what you were asking ;)
Write an inequality relating the given side lengths. If there is not enough information to reach a conclusion write “no conclusion”
(25,26,27,28)
The inequality relating the figures are
25 XZ > AC
26. DF < FD
27. 38 > x > 11
28. 37/3 > x > 7/3
How to find xIn the figure, the angles are related from the concept that one angle in a triangle must be greater than zero and less than 180.
In addition, when other dimensions are equal the side having greater length will have greater angle facing it.
27. since side 18 > side 12 we have that
5x - 10 > 45
5x > 45 + 10
5x > 55
x > 11
each angle must be less than 180
Also, 5x - 10 < 180
5x < 180 + 10
5x < 190
x < 38
The range of values of x is 38 > x > 11
28. since side 9 > side 6
30 > 3x - 7
30 + 7 > 3x
37 > x
x < 37/3
each angle must be greater than 0
3x - 7 < 0
3x > 7
x > 7/3
The range of values of x is 37/3 > x > 7/3
Learn more about inequality at
https://brainly.com/question/25275758
#SPJ1
find the average rate of change of the car's position on the interval . include units on your answer.
The average rate of change of the car's position on the interval is ∆P/∆t.
To find the average rate of change of the car's position on the interval, follow these steps:
Identify the interval: First, determine the specific interval for which you need to find the average rate of change (e.g.,
between times t1 and t2).
Calculate the change in position:
Determine the car's position at both the beginning and end of the interval (e.g., positions P1 and P2).
Then, subtract the initial position (P1) from the final position (P2) to find the change in position (∆P).
Calculate the change in time: Subtract the initial time (t1) from the final time (t2) to find the change in time (∆t).
Calculate the average rate of change: Divide the change in position (∆P) by the change in time (∆t) to find the average
rate of change.
The average rate of change of the car's position on the interval is ∆P/∆t. Include units in your answer (e.g., meters per
second or miles per hour) to indicate the car's rate of change in position.
for such more question on average
https://brainly.com/question/20118982
#SPJ11
suppose that prior to conducting a coin-flipping experiment, we suspect that the coin is fair. how many times would we have to flip the coin in order to obtain a 98% confidence interval of width of at most .15 for the probability of flipping a head? (note that the z-score was rounded to three decimal places in the calculation) a) 241 b) 185 c) 238 d) 188 e) 247 f) none of the above
The minimum number of coin flips required to obtain a 98% confidence interval width of at most 0.15 is 188.
Hence option d is correct.
We'll use the formula for the confidence interval of a proportion, which is given by:
CI = p-hat ± (z * sqrt(p-hat * (1-p-hat) / n))
Here, p-hat represents the sample proportion (observed proportion of heads), z is the z-score for the desired confidence level (98% in this case), and n is the number of coin flips.
We want to find the minimum number of coin flips (n) needed to obtain a confidence interval width of at most 0.15. Since we suspect that the coin is fair, we'll assume p-hat = 0.5.
For a 98% confidence interval, the z-score (rounded to three decimal places) is 2.576.
Now, we'll set up the inequality:
0.15 >[tex]= 2 * (2.576 * \sqrt{(0.5 * (1-0.5) / n))}[/tex]
Squaring both sides and solving for n, we get:
n >= [tex]((2.576 * \sqrt{(0.25))^2) / (0.15/2)^2}[/tex]
n >= 188.423
Since the number of coin flips must be a whole number, we'll round up to the nearest integer, which is 188.
Hence option d is correct.
For similar question on confidence.
https://brainly.com/question/29570668
#SPJ11
Question 14(Multiple Choice Worth 2 points)
(Creating Graphical Representations MC)
A random sample of 100 middle schoolers were asked about their favorite sport. The following data was collected from the students.
Sport Basketball Baseball Soccer Tennis
Number of Students 17 12 27 44
Which of the following graphs correctly displays the data?
histogram with the title favorite sport and the x axis labeled sport and the y axis labeled number of students, with the first bar labeled basketball going to a value of 17, the second bar labeled baseball going to a value of 12, the third bar labeled soccer going to a value of 27, and the fourth bar labeled tennis going to a value of 44
histogram with the title favorite sport and the x axis labeled sport and the y axis labeled number of students, with the first bar labeled baseball going to a value of 17, the second bar labeled basketball going to a value of 12, the third bar labeled tennis going to a value of 27, and the fourth bar labeled soccer going to a value of 44
bar graph with the title favorite sport and the x axis labeled sport and the y axis labeled number of students, with the first bar labeled basketball going to a value of 17, the second bar labeled baseball going to a value of 12, the third bar labeled soccer going to a value of 27, and the fourth bar labeled tennis going to a value of 44
bar graph with the title favorite sport and the x axis labeled sport and the y axis labeled number of students, with the first bar labeled baseball going to a value of 17, the second bar labeled basketball going to a value of 12, the third bar labeled tennis going to a value of 27, and the fourth bar labeled soccer going to a value of 44
Question 15(Multiple Choice Worth 2 points)
The correct graph is: bar graph with the title favorite sport and the x axis labeled sport and the y axis labeled number of students, with the first bar labeled basketball going to a value of 17, the second bar labeled baseball going to a value of 12, the third bar labeled soccer going to a value of 27, and the fourth bar labeled tennis going to a value of 44
How to explain the graphSince the data is categorical and discrete, a bar graph is appropriate to display the data. The bars should be labeled with the sports, and their heights should correspond to the number of students who chose each sport.
A histogram is not appropriate because the data is not continuous. Also, the order of the bars does not matter in this case since the data is not ordinal.
Learn more about graph on
https://brainly.com/question/19040584
#SPJ1
I need some help please
Answer: it is 3/2x x + 0
Step-by-step explanation:
you do rise over run which is 3 up and 2 over in this case. and the 0 is the y intercept but its at the center also known as the origin so its 0
Answer:
Step-by-step explanation:
there are three urns that contain a mixture of black and red balls as shown in table 1: no. of red balls no. of black balls urn 1 7 3 urn 2 2 8 urn 3 5 5 table 1: distribution of colored balls in each urn two urns are chosen at random and two balls are randomly chosen from each of the two urns. what is the probability that all four chosen balls are red?
The probability that all four chosen balls are red is 14/6075.
What is probability?Probability is a way to gauge how likely or unlikely something is to happen. It is a number between 0 and 1, where 0 denotes an improbable event and 1 denotes an inevitable one.
According to question:Let's first find the probability of choosing two red balls from each of the two urns separately and then multiply the results.
The probability of choosing two red balls from urn 1 is:
P(2 red balls from urn 1) = (7/10) * (6/9) = 7/15
Similarly, the probability of choosing two red balls from urn 2 is:
P(2 red balls from urn 2) = (2/10) * (1/9) = 1/45
And the probability of choosing two red balls from urn 3 is:
P(2 red balls from urn 3) = (5/10) * (4/9) = 2/9
Now, we need to find the probability of choosing two urns out of three, and since the order in which we choose the urns does not matter, we can use combinations:
Number of ways to choose two urns out of three = C(3, 2) = 3
Therefore, the probability of choosing two urns out of three is 3/3 = 1.
Finally, we need to multiply the probability of choosing two red balls from each of the two urns and the probability of choosing two urns out of three:
P(all four balls are red) = P(2 red balls from urn 1) * P(2 red balls from urn 2) * P(2 red balls from urn 3) * P(choose two urns out of three)
= (7/15) * (1/45) * (2/9) * 1
= 14/6075
Therefore, the probability that all four chosen balls are red is 14/6075.
To know more about probability visit:
https://brainly.com/question/30034780
#SPJ1
The equation y = 2x + 3
represents the cost y (in dollars) of mailing a package that weighs x pounds.
a. Use a graph to estimate how much it costs to mail
the package.
b. Use the equation to find exactly how much it costs
to mail the package.
Thus, the price for the to mail the package of weight 1.126 lb is found as: $5.25.
Explain about the slope intercept form:Simply put, the slope-intercept form is the way to write a line's equation so that the y-intercept (where its line crosses its vertical y-axis) and slope (steepness) are instantly visible. This form is frequently known as the y = mx + b form. One of the line types that is taught in algebra schools the most is this one.
Draw a line connecting the points (because x and y are weights and costs, respectively, they must be positive; as a result, the function's graph only includes the section in Quadrant I):
Given equation:
y = 2x + 3
Put x = 0 , y = 3 ;(0,3)
Put y = 0, x = -1.5 ; (-1.5, 0)
when weight x = 1.126lb.
cost y (in dollars) and weighs x pounds.
y = 2(1.126) + 3
y = 5.252
y ≈ 5.25
Thus, the price for the to mail the package of weight 1.126 lb is found as: $5.25 .
Know more about the slope intercept form:
https://brainly.com/question/1884491
#SPJ1
Complete question:
The equation y = 2x + 3 represents the cost y (in dollars) of mailing a package that weighs x pounds.
Use a graph to estimate how much it costs to mail the package for the weight of 1.126 lb.
which measures of center and variability would be most appropriate to describe the given distribution?
The choice of measures of center and variability depends on the shape and characteristics of the distribution. If the distribution is skewed or has outliers, then the median and IQR would be more appropriate measures of center and variability, respectively.
What is median?The median is a measure of central tendency that represents the middle value in a dataset when the data is arranged in order of magnitude. Specifically, it is the value that separates the data set into two equal halves. In other words, half of the values in the dataset are greater than the median, and the other half are less than the median.
To calculate the median, you first need to arrange the data in order from lowest to highest (or highest to lowest).
The value that divides the data set into two equal portions is called the median. It is a robust measure of center, meaning that it is not affected by extreme values or outliers. The IQR is the range of values that contains the middle 50% of the data, and it is also a robust measure of variability.
To know more about median, visit:
https://brainly.com/question/28060453
#SPJ1
1. suppose we know that the average weight of coyotes is 14.5kg with a standard deviation of 4kg. what is the probability of trapping a coyote that is 17kg or larger?
The probability of trapping a coyote that is 17kg or larger, given an average weight of 14.5kg and a standard deviation of 4kg is approximately 0.2743 or 27.43%.
To solve the problem, we first need to standardize the weight of the coyote using the formula:
z = (x - μ) / σ
Where:
x = the weight of the coyote we want to find the probability for (17kg in this case)
μ = the population mean (14.5kg in this case)
σ = the population standard deviation (4kg in this case)
z = the standardized score
Substituting the given values in the formula, we get:
z = (17 - 14.5) / 4
z = 0.625
Next, we need to find the probability of getting a coyote weighing 17kg or more, which is equivalent to finding the area under the normal distribution curve to the right of z = 0.625. We can use a standard normal distribution table or a calculator to find this probability.
Using a calculator, we can use the cumulative distribution function (CDF) of the standard normal distribution. The CDF gives the area under the curve to the left of a specified z-score. Since we want the area to the right of z = 0.625, we can subtract the CDF from 1 to get the area to the right.
Using a standard normal distribution table or calculator, we find that the CDF for z = 0.625 is approximately 0.734. Therefore, the area to the right of z = 0.625 is 1 - 0.734 = 0.266 or 26.6%.
Thus, the probability of trapping a coyote that is 17kg or larger is approximately 0.266 or 26.6%.
For more questions like Probability click the link below:
https://brainly.com/question/30034780
#SPJ11
Using a standard normal distribution table or a calculator, the probability of trapping a coyote that is 17kg or larger is approximately 0.266 or 26.6%.
What exactly is a standard normal distribution?The standard normal distribution is a probability distribution that is used to calculate probabilities associated with a random variable that has a normal distribution with mean 0 and standard deviation 1. Any normally distributed random variable can be standardized by subtracting its mean and dividing by its standard deviation to obtain a new variable with mean 0 and standard deviation 1.
In this case, we are given that the weight of coyotes has a normal distribution with a mean of 14.5kg and a standard deviation of 4kg. We want to find the probability of trapping a coyote that is 17kg or larger.
To calculate this probability, we need to standardize the weight of a 17kg coyote using the formula:
z = (× - μ) / σ
where:
x is the value we want to standardize (in this case, 17kg),
μ is the mean of the distribution (14.5kg),
σ is the standard deviation of the distribution (4kg).
Substituting the values we have:
[tex]z =\frac{(17 - 14.5)}{4} = 0.625[/tex]
This value of 0.625 is the z-score for a coyote weighing 17kg. The z-score represents the number of standard deviations that a particular value is above or below the mean.
Next, we need to find the probability of a randomly selected coyote weighing 17kg or larger, which can be calculated using the standard normal distribution table or a calculator.
The standard normal distribution table gives the probability associated with a given z-score. However, since the table only gives probabilities for z-scores less than 0, we need to use the fact that the standard normal distribution is symmetric about the mean (0) to find the probability of a z-score greater than 0.625.
Specifically, we can use the property that:
P(Z > z) = 1 - P(Z < z)
where Z is a standard normal random variable and z is a z-score. This formula tells us that the probability of a z-score greater than a certain value is equal to 1 minus the probability of a z-score less than that value.
Using this formula, we can calculate:
P(Z > 0.625) = 1 - P(Z < 0.625)
We can look up the value of P(Z < 0.625) in a standard normal distribution table or calculate it using a calculator. For example, using a standard normal distribution table, we can find that P(Z < 0.625) = 0.734.
Substituting this value into the formula, we get:
P(Z > 0.625) = 1 - 0.734 = 0.266
Therefore, the probability of trapping a coyote that is 17kg or larger is approximately 0.266 or 26.6%.
Learn more about probability here:
https://brainly.com/question/13604758
#SPJ11
Kenishe packs 3 crates of merchandise the crates have masses of 65 kg 72 kg and 42 kg how many kg of merchandise does Kenisha pack
As Kenisha packs three crates of merchandise having masses of 65kg , 72 kg and 42 kg, he or she packs total of 179 kg of merchandise.
Kenisha has 3 crates of merchandise.
Each of the crates have different masses, those are as : first crate has mass 65 kg, second has mass of72 kg and third case has mass of 42 kg.
By simple addition rule we get,
The total masses of three crates is = (65 + 72 + 42) kg
=179 kg
Thus, Kenisha has packed 179 kg of merchandise as he or she has packed three crates having masses 65 kg, 72kg and 42kg.
To know more about properties of addition here
https://brainly.com/question/14092461
#SPJ4
Can someone help me asap? It’s due tomorrow. I will give brainiest if it’s correct.
Area of semicircle:
Area of Rectangle:
Total Area:
1. The area of the semi circle is 56.52ft²
2. The area of the rectangle is 228ft²
3. The total area is 284.52ft²
What is area of a shape?The area of a shape is the space occupied by the boundary of a plane figures like circles, rectangles, and triangles.
The area of a semi circle is expressed as;
A = 1/2 πr²
r = d/2 = 12/2 = 6ft
A = 1/2×3.14 × 6²
A = 56.52ft²
therefore the area of the semicircle is 56.52ft²
The area of a rectangle is expressed as;
A = l×w
= 19×12
= 228ft²
therefore the area of the rectangle is 228ft²
The total area = (228+56.52)ft²
= 284.52ft²
learn more about area of shape from
https://brainly.com/question/27743799
#SPJ1
Integers can be represented by repeatedly adding or subtracting the number 1. For example, the integer 3 can be represented as 0 + 1 + 1 + 1, and the integer -3 can be represented as 0 - 1 - 1 - 1. Hence, the definition "an integer is the number 0 or any number obtained by repeatedly adding 1 to this number" is true.
"An integer is the number 0 or any number obtained by repeatedly adding 1 to this number" is not entirely true.
True that integers can be represented by repeatedly adding or subtracting the number 1,
The fact that integers can also be negative and can be obtained by repeatedly subtracting 1 from 0 or another negative integer.
The definition does not account for the fact that integers can be represented using other operations, such as multiplication or division. The integer 12 can be represented as 4 x 3 or as 24 ÷ 2.
A more accurate definition of an integer is a whole number that can be positive, negative, or zero.
Integers can be represented using addition, subtraction, multiplication, or division, and can be used to represent quantities such as counts, distances, temperatures, and other measurable quantities.
The original definition is a useful way to understand how integers can be represented using addition and subtraction, it is not a complete or entirely accurate definition of what integers are.
For similar questions on subtracting
https://brainly.com/question/28467694
#SPJ11
What is a simplified form of the expression 2(–x + 2) + 3x? how do i do this?
Answer:
x + 4
Step-by-step explanation:
2(–x + 2) + 3x
-2x + 4 + 3x
x + 4
at confidence, what is the margin of error and the interval estimate of the number of -year-old drivers in 2008? round your answers to four decimal places.
Thus, the interval estimate of the number of drivers under the age of 19 in 2008, together with its margin of error of 0.0245.
Explain about the confidence interval:An unknown population parameter's value is likely to be within the bounds of a confidence interval (CI), which is a range of values. Given the qualities of your sample data, these intervals reflect a likely domain for the parameter.
Confidence intervals are computed using a predetermined degree of confidence and are obtained from sample statistics.
Margin of error ME = z(α/2)√[p(1-p)/n]
confidence interval = 95%
z(α/2) value for the 95% confidence interval = 1.96 (taken from attached table)
P = 75% = 0.75
1-p = 1 - 0.75 = 0.25
n = 1200
Put the values in formula:
ME = (1.96)*√[0.75*0.25 / 1200]
ME = (1.96)*√0.00015625
ME = 0.0245
Thus, the interval estimate of the number of drivers under the age of 19 in 2008, together with its margin of error of 0.0245.
Know more about the confidence interval:
https://brainly.com/question/20309162
#SPJ1
Complete question:
Fewer young people are driving. In 1983, 87% of 19-year-olds had a driver’s license. Twenty-five years later (in 2008) that percentage had dropped to 75%. Suppose these results are based on a random sample of 1200 19-year-olds in 1983 and again in 2008. At a 95% confidence, what is the margin of error and the interval estimate of the number of 19-year-old drivers in 2008?
How is the volume of the first rectangular prism with base 2m by 3m and height 5m related to the volume of the second rectangular prism with base 3m by 5m and height 2m? Explain.
Answer:
they have the same volume
Step-by-step explanation:
in order to find the volume of a rectangular prism you have to multiply the width,height and length.
2 × 3 × 5 = 30.since both prisms have the same numbers ,they have the same volume.
hope this helps :)
Answer:
The volumes of the two rectangular prisms are the same.
Step-by-step explanation:
For the first rectangular prism, the area of the base is 6 square meters, and the height is 5 meters, so the volume is 30 cubic meters.
For the second rectangular prism, the area of the base is 15 square meters, and the height is 2 meters, so the volume is 30 cubic meters, the same volume as the first rectangular prism.
a motor boat traveling at 18 miles per hour traveled the length of a lake in one-quarter of an hour less time than it took when traveling at 12 miles per hour. what was the length in miles of the lake?
The length of the lake in miles for the given situation of travelling motor boat is equal to 9 miles.
Let us consider the length of the lake be d in miles.
Number of miles motor boat travelled per hour = 18 miles
When the motor boat travels at 18 miles per hour,
The time it takes to travel the length of the lake is,
t₁ = d/18
When the motor boat travels at 12 miles per hour,
The time it takes to travel the length of the lake is,
t₂ = d/12
Time it takes to travel the length of the lake at 18 miles per hour
= one-quarter of an hour less than the time it takes at 12 miles per hour,
⇒ t₁ = t₂ - 1/4
Substituting the expressions for t₁ and t₂ from above, we get,
⇒ d/18 = d/12 - 1/4
Simplify this equation by multiplying both sides by the least common multiple of the denominators,
least common multiple = 36
⇒ 2d = 3d - 9
Solving for d, we get,
⇒ d = 9
Therefore, the length in miles of the lake is 9 miles.
learn more about miles here
brainly.com/question/29173795
#SPJ4