Answer:
Hi how are you doing today Jasmine
Trigonometry: True/False question posted on the image
Answer:
true
Step-by-step explanation:
A triangle is a three-sided polygon with three edges and three vertices. the sum of angles in a triangle is 180 degrees
Area of a triangle = 1/2 x base x height
the perimeter of a triangle = sum of the side lengths
A right angled triangle has a 90 degree angle and two other sides that sum up to 90 degrees. this makes the sum of angles 180 degrees
A BluRay disc normally costs $22. This week it is on sale for 25% off the original price. How much money is discounted from the original price of the BluRay disc?
Answer:
$7.33
Step-by-step explanation:
22=3/4x
22/.75=22*4/3=29.3333333
$29.33-$22=$7.33
A discounted from the original price of the Blu-ray disc will be $5.5.
What is mean by Percentage?
A number or ratio that can be expressed as a fraction of 100 or a relative value indicating hundredth part of any quantity is called percentage.
To Calculate the percent of a number , divide the number by whole number and multiply by 100.
Given that;
Cost of a Blu-ray disc = $22
The sale on the cost of a Blu- ray = 25%
Now,
Find the discounted price of a Blu-ray as;
Discounted price = 25% of $22
= 25 x $22 / 100
= $550/100
= $5.5
Thus, A discounted from the original price of the Blu-ray disc will be $5.5.
Learn more about the percentage visit:
https://brainly.com/question/843074
#SPJ2
*giving brainiest to the first correct answer. Write the equation of the line graphed.
Answer:
The equation of the line is x = 2
Answer:
x = 2
Step-by-step explanation:
When you are given a straight line whether it's horizontal or vertical on a graph and is told to write it as an equation,
it can be a horizontal line, y = the number the line is on from the y-axis
or a vertical line, x = the number the line is on from the x-axis.
In this case you have a vertical line so the equation would be
x = the number the line is on from the x-axis, which is 2 so your final answer would be
x = 2
WILL MARK BRAINLIEST PLS HELP ME
Answer:
c 480 square inches your welcome
Maxwell buys a bag of dog food that contains 18 cups of food, Maxwell feeds his dog 1 cups each day. Maxwell says he will be able to feed his dog for 27 days.
correct?
Answer:
Incorrect
Step-by-step explanation:
Well since there is only 18 cups of dog food he will only be able to feed his dog for 18 days since he feeds his dog 1 cup a day.
Answer:
Incorrect
Explanation:
Maxwell's dog eats one cup of food a day. The bag contains only eighteen cups, so it will feed the dog for eighteen days. There will not be enough food to last Maxwell for 27 days. So, the answer is incorrect.
Find tan 0.
(Lots of points if correct)
Answer:
Your answer is 15/8
I need help fast please answer!
Answer:
B
Step-by-step explanation:
What is the position of the term 301 in the sequence defined by 3n + 1
Answer:
n=100
Step-by-step explanation:
3n+1=301
3n=300
n=100
Help giving brainliest please help
Answer:
C. The mode of the number of miles Ian skated in July is less than the mode of the number of miles Ian skated in August.
Step-by-step explanation:
A. is not correct because the least amount he skated in July was 1 which is not greater than the least amount In August, 5
B. is not correct because the median number for July was 8 which is not greater than the median of August, 10
C. is correct because 8 is the most common number in July which is less than 10, the most common number in August.
D. is not correct because the range in July is 14 (15-1=14) which is not less than the range in August, 8 (13-5=8)
1. Name the side lengths of a 30 degree triangle. Hint adjacent, opposite, and hypotenuse.
Help pls help I need help
Answer:
bro no one can see that
Step-by-step explanation:
Answer:
8ounces
Step-by-step explanation:
pounds* 16= ounces
therefore 1/2pounds *16=8ounces
Which expression is equivalent to (6^-2)^3
5(x+8)
Help please!!!!!!!!!!!!!!!!!!
Answer:
5x+40
Step-by-step explanation:
You would distribute 5 to x+8 and that would add up to 5x+40.
Answer:
Step-by-step explanation:
5x+40
If Amelia wants to make the maximum amount of money working only 22 hours per week, which company should she work for? Explain your answer. Company A: Using linear regression models from both data sets, she determines that it pays about $14 more. Company A: Using quadratic regression models from both data sets, she determines that it pays about $5 more. Company B: Using linear regression models from both data sets, she determines that it pays about $10 more. Company B: Using exponential regression models from both data sets, she determines that it pays about $8 more.
Answer:
B
Step-by-step explanation:
Answer:
Company A
Step-by-step explanation:
She should work for company A because they pay the most. Also because she would earn $308 during 22 hours. Hopes this helps! :)
What is the area of a triangle with vertices at (–3, 3), (2, 3), and (4, 7)?
Answer:
I think the answer is 20 i hope this helped
Step-by-step explanation:
10 units.
ㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤㅤ
Sorry for the blurryness. Please answer correctly and I guarantee I will mark you brainliest :)
Answer:
42
Step-by-step explanation:
37-79=42
SOLVE FOR X PLS!! 50 POINTS! URGENT
Answer:
5
Step-by-step explanation:
The given two triangles are similar , therefore ,
⇒ 5x /20 = 45/36
⇒ x/4 = 5/4
⇒ x = 5/4 × 4
⇒ x = 5
Hence the value of x is 5.
Don’t waste an answer if you ain’t gonna help :)
In a survey of 12 people, it was found that an average of $36 was spent on their child's last birthday gift with a standard deviation of $11. Estimate the mean amount people spend on their child's last birthday gift with 80% confidence using the appropriate critical value to three decimal places. Enter your answer as equations or as numbers rounded to four decimal places.
Answer:
(27.3692 ; 44.6308)
Step-by-step explanation:
Mean, xbar = 36
Standard deviation, s = 11
Sample size, n = 12
Tcritical at 0.2, df = 12 - 1 = 11 ; Tcritical = 2.718
Confidence interval :
Xbar ± Margin of error
Margin of Error = Tcritical * s/sqrt(n)
Margin of Error = 2.718 * 11/sqrt(12) = 8.6308
Confidence interval :
Lower boundary : 36 - 8.6308 = 27.3692
Upper boundary : 36 + 8.6308 = 44.6308
(27.3692 ; 44.6308)
1. Explain why it makes sense to call the following expression a “perfect
square." *
x2 + 20x + 100
Answer:
because all sides are equal
The expression is a perfect square of (x+10)².
What is perfect square?A perfect square is a number that can be expressed as the product of an integer by itself or as the second exponent of an integer.
For example, 25 is a perfect square because it is the product of integer 5 by itself, 5 × 5 = 25.
Given that the expression, x² + 20x + 100,
So, writing the expression as expanded form,
x·x + 2·10·x + 10·10
x² + 2·10·x + 10²
We see it is in the form of a² + 2ab + b²,
We know that, a² + 2ab + b² = (a+b)²
So,
x² + 2·10·x + 10² = (x+10)²
Hence the expression is a perfect square of (x+10)².
Learn more about perfect square click;
https://brainly.com/question/29056294
#SPJ2
please help!!!
Can you use Pythagorean Theorem to find the missing side of this triangle? Why or why not?
Answer and Explain, please.
Answer:
No, Pythagorean Theorem can't be used here for finding the missing sides of the triangle.
Because Pythagorean Theorem is used in triangles having one of its sides right angled but here in the diagram non of the sides of the triangle are right angled .
Answer:
NO
Because pythagorean Theorem is used to find the missing side in the triangle if the other sides are there
Use 1% or 10% method to estimate. Show all work. 38% of 15
Use 1% or 10% method to estimate. Show all work. 4% of 220
Use 1% or 10% method to estimate. Show all work. 29% of 75
would like it soon, its homework due in a bit.
Answer:
DIVIDE THE TWO ANWSER
Step-by-step explanation:
Write an equation for the line that passes through (0, -9) and (3, 0).
y = 3 x + 9
y = 3 x + 3
y = 3 x - 9
y = -9 x + 3
Answer:
y = 3x - 9
Step-by-step explanation:
1) First, find the slope of the line between the two points. Use the slope formula [tex]m = \frac{y_2-y_1}{x_2-x_1}[/tex] and substitute the x and y values of (0,-9) and (3,0) into the formula and simplify:
[tex]m = \frac{(0)-(-9)}{(3)-(0)} \\m = \frac{0+9}{3} \\m = 3[/tex]
So, the slope is 3.
2) Look at all the options. All the equations are in slope-intercept form since they are in a [tex]y = mx + b[/tex] format. Remember that [tex]m[/tex], or the coefficient of the x-term, is the slope. [tex]b[/tex], or the y-intercept, represents the y-intercept.
Knowing this, the answer must be [tex]y = 3x-9[/tex]. The number in place of [tex]m[/tex] is 3, which is the slope we just calculated. Also, since we know that the line passes through (0, -9), that must be the y-intercept since all points on the y-axis have an x-value of 0.
Please help I need this done!
Will give the brainliest!
Answer:
(See explanation for all answers)
Step-by-step explanation:
4.
A. 3/16
It says in the chart that 4 text messages have a probability of 3/16.
5.
D. 13/16
You just have to add up all the probabilities under four.
6.
B. 5/8
At least two messages means that you need to add up all the probabilities 2 and above.
Hope this helps!
-Luna
Given: A = { 1, 2, 3, 4 } , B = { 1, 3, 5, 7 } , C = { 2, 4, 6 } .
Step-by-step explanation:
I hope you like my answer. Thanks.
How to solve (x+7)(x-9)>0
9514 1404 393
Answer:
(x < -7) ∪ (x > 9)
Step-by-step explanation:
The zeros of the function are the values of x that make the factors zero.
x +7 = 0 ⇒ x = -7
x -9 = 0 ⇒ x = 9
When this is expanded, we can see that the leading coefficient is positive.
x² -2x -63 > 0
This means the parabola opens upward. It will be greater than 0 for x-values to the left of the left zero, and to the right of the right zero. (It is less than zero between those values.)
The solution is x < -7 or x > 9.
_____
In general, for polynomial inequalities, look for the locations of the zeros. The sign of the polynomial will have the sign of the leading coefficient for values of x to the right of the right-most zero. (Here, positive for x > 9.) As you progress farther to the left along the number line, the polynomial changes sign at each zero.
Here, the polynomial becomes negative between the values x=9 and x=-7. Then it is positive again for x < -7.
g The proportion of U.S. births that result in a birth defect is approximately 1/33 according to the Centers for Disease Control and Prevention (CDC). A local hospital randomly selects five births and lets the random variable X count the number not resulting in a defect. Assume the births are independent. What is the probability that at least one of the births results in a defect
Answer:
0.1426 = 14.26% probability that at least one of the births results in a defect.
Step-by-step explanation:
For each birth, there are only two possible outcomes. Either it results in a defect, or it does not. The probability that a birth results in a defect is independent of any other birth. This means that the binomial probability distribution is used to solve this question.
Binomial probability distribution
The binomial probability is the probability of exactly x successes on n repeated trials, and X can only have two outcomes.
[tex]P(X = x) = C_{n,x}.p^{x}.(1-p)^{n-x}[/tex]
In which [tex]C_{n,x}[/tex] is the number of different combinations of x objects from a set of n elements, given by the following formula.
[tex]C_{n,x} = \frac{n!}{x!(n-x)!}[/tex]
And p is the probability of X happening.
The proportion of U.S. births that result in a birth defect is approximately 1/33 according to the Centers for Disease Control and Prevention (CDC).
This means that [tex]p = \frac{1}{33}[/tex]
A local hospital randomly selects five births.
This means that [tex]n = 5[/tex]
What is the probability that at least one of the births results in a defect?
This is:
[tex]P(X \geq 1) = 1 - P(X = 0)[/tex]
In which
[tex]P(X = x) = C_{n,x}.p^{x}.(1-p)^{n-x}[/tex]
[tex]P(X = 0) = C_{5,0}.(\frac{1}{33})^{0}.(\frac{32}{33})^{5} = 0.8574[/tex]
[tex]P(X \geq 1) = 1 - P(X = 0) = 1 - 0.8574 = 0.1426[/tex]
0.1426 = 14.26% probability that at least one of the births results in a defect.
ΔRST~ΔUVW. If ST=36 inches, UV=45 inches, and VW=18 inches, what is the length of RS?
Answer:
hi
Step-by-step explanation:
hi can you please help me with my work
A DVD player costs a store $185 to purchase from the manufacturer. They mark the price of the DVD player up by 20% for profit. How much do they charge for the DVD player?
Answer:
$222
Step-by-step explanation:
$185 x 1.2 = $222
Answer:
222
Step-by-step explanation:
Hi! So marking up means to raise the price or increase it.
185 is the whole, a whole is 100
and we need to raise it by 20% so add these two together to get 120%, turn this into a decimal is 1.2, now to find and increase we multiply it by the original price.
1.2 x 185 = 222
Very sorry if it is wrong.