Answer:
you dont have 7 to 11
Step-by-step explanation:
13.a
15.a
12.i
14.h
WILL GIVE BRAINLIEST ANSWER!
You are locked out of your house and the only open window on the second floor is 25 feet above the ground. You need to borrow a ladder from one of your neighbors. There is a bush along the edge of the house, so you will have to place the ladder 10 feet from the house. What length of the ladder do you need to reach the window?
What type of number is 18.62
Answer:
terminating decimal
Step-by-step explanation:
doesn't repeat
Tessa returned a book to the library 16 days
late. If she was charged $0.35 per day,
what was the total fine?
Answer:
5.60
Step-by-step explanation:
Answer: $5.60
Step-by-step explanation:
Given:
Tessa did not return her book for 16 daysThe fee per day was $0.35We must find:
The total cost after 16 daysLet t = total cost.
We will multiply 0.35 by 16 to get the answer.
t = 5.60105 is divisible by what 2 5 10
To determine the number of trout in a lake, a conservationist catches 94 trout, tags them and throws them back into the lake. Later, 30 trout are caught; 10 of them are tagged. How many trout would the conservationist expect to be in the lake?
Answer:
She would expect to find about 282 fish in the lake.
Step-by-step explanation:
What is the value of the expression 8(-6.3)
Answer:
-50.4
Step-by-step explanation:
Use the number line to identify the least value, first quartile, median, third quartile, and greatest value of the data.
Ages of teachers (in years): 30, 62, 26, 35, 45, 22, 49, 32, 28, 50, 42, 35
Answer: least value - 22
first quartile - 29
median - 35
third quartile - 47
greatest value - 62
Step-by-step explanation:
Subtract the following polynomials, then place the answer in the proper location on the grid.
2x^2+5x-10
3x2 - x + 9
Answer:
[tex]-x^2+6x-19[/tex]
Step-by-step explanation:
Step one:
given
[tex]2x^2+5x-10\\\\3x^2 - x + 9[/tex]
we want to perform a subtraction operation
[tex]2x^2+5x-10-(3x^2 - x + 9)\\\\ 2x^2+5x-10-3x^2 + x - 9 \\\\[/tex]
collect like terms
[tex]2x^2-3x^2+5x+x-10-9\\\\-x^2+6x-19[/tex]
A rectangular parking lot is 3/4 mile long. If the area is 3/8 square mile, what is the width of the lot?
Answer:
it's .5 or 1/2
Step-by-step explanation:
3/8 ÷ 3/4 = 1/2
A family's monthly utility costs are: phone $200, electric $100, cable TV $100, water/gas $50, internet $50. By eliminating cable, by what percent does the family reduce total utility cost?
Answer: The total will drop by 20%
write down the relation between mass and inerti
Answer:
The mass of an object is directly proportional to its inertia.
[tex]m\alpha I[/tex]
Where
m = mass
I = inertia
Step-by-step explanation:
We can first of all start by defining the two key terms present here - mass and inertia.
The mass of an object is the quantity of matter contained in the object.
The inertia of an object is the resistance of an object which is in a state of rest to motion
The mass of an object is directly proportional to its inertia.
The heavier an object is, the more inertia it has. To put things into perspective, you can easily push a bicycle because it does not really have a lot of mass, as opposed to pushing an eighteen-wheeler trailer.
Point slope form.
Y-4=
If I have 23 dirty walnuts and divide the by 2 how many dirty walnuts would I have by chance? OMG PLEASE HELP QUESTION ALREADY LATE!!!
Answer:
23/2 equals 11.5
Step-by-step explanation:
Answer:
23 divided by two is 11.5
Step-by-step explanation:
HELP ME PLEASE I WILL PUT U AS BRILLIANT
Answer:
2 and 1/4
Step-by-step explanation:
3.5 - 1.25 = 2.25
2.25 as a mixed number is 2 and 1/4
G is the centroid of AABC, FC = 35, AG = 42, BF = 57, and DG = 14. Find BG.
Answer:
[tex] BG = 38 [/tex]
Step-by-step explanation:
Based on centroid theorem of triangles:
[tex] BG = \frac{2}{3} \times BF [/tex]
[tex] BF = 57 [/tex]
Plug in the value into the equation
[tex] BG = \frac{2}{3} \times 57 [/tex]
[tex] BG = \frac{2 \times 57}{3} [/tex]
[tex] BG = \frac{114}{3} [/tex]
[tex] BG = 38 [/tex]
Please help me with my question
Answer: use mahthway it hels
Step-by-step explanation:
Kevin ran 5 miles in 42 minutes. How many miles per hour did Kevin run? Round to the nearest tenth.
he ran a mile in 8.4 minutes. Step-by-step explanation:
The other answer choice is 30
Answer:
21 pencils
Step-by-step explanation:
b 21 pencils
X is normally distributed random variable with mean 63 and standard deviation 6, the probability that X lies between 45 and 81 is
Answer:
P(45<X<81) = P(-3<z<3)=0.9974 or 99.74%
Step-by-step explanation:
Mean = 63
Standard Deviation =6
We need to find probability that X lies between 45 and 81 i.e P(45<X<81)
First we will find z-score for X=45 and X=81
For X=45 the z-score can be found using formula: [tex]z-score=\frac{X-\mu}{\sigma}[/tex]
Putting values and finding z-score
[tex]z-score=\frac{X-\mu}{\sigma}\\z-score=\frac{45-63}{6}\\z-score=-3[/tex]
For X=45, z-score is -3
For X=81 the z-score can be found using formula: [tex]z-score=\frac{X-\mu}{\sigma}[/tex]
Putting values and finding z-score
[tex]z-score=\frac{X-\mu}{\sigma}\\z-score=\frac{81-63}{6}\\z-score=3[/tex]
For X=81, z-score is 3
Now finding the probability of P(-3<z<3)
It can be solved as:
P(-3<z<3)=P(z<3)-P(z<-3)
Looking at the z-score table to find
P(z<3)= 0.9987
P(z<-3)=0.0013
So, P(-3<z<3)=P(z<3)-P(z<-3)
P(-3<z<3)=0.9987 - 0.0013
P(-3<z<3)=0.9974
or P(-3<z<3)= 99.74%
So, P(45<X<81) = P(-3<z<3)=0.9974 or 99.74%
You go to a Chicago Bears game. You spend a total of $72 buying brats "b" and hotdogs "h" for your group. You paid $6 per brat and $4 per hotdog. You bought a total of 14 brats and hotdogs. How many of each did you buy?
A project consists of three tasks: A, B, and C. Task A is known to take five days for sure. Tasks B and C are each dependent on A. B takes five days. C takes seven days with a probability of 0.5 and three days with a probability of 0.5. What is the expected completion time of the project
Answer:
The expected completion time of the project is:
10 days.
Step-by-step explanation:
Duration of Task A = 5 days
Task B and C depend on Task A
This implies that Task A must be completed before Task B and C can be started.
To complete Task B will take 5 days
To complete Task C will take 5 days (7 * 0.5) + (3 * 0.5)
Since Task A takes 5 days and Tasks B and C depend on Task A and Task B takes 5 days and Task C takes expected time of 5 days, it means that the project can be completed in 10 days (5 + 5) if tasks B and C are simultaneously carried out.
The expected completion time of the project is
(i)10 days if B&C are mutually independent
(ii)15 days if B &C are mutually dependent
What is the expected completion time of a task?Expected completion time of a task= p1x1 + p2x2
Where
p1 & p2 are probabilities.
x1 and x2 are samples.
p1=p2=0.5
x1=7
x2=3
Expected completion time of task C= 0.5*7+0.5*3 = 5 days
Task B and C will be due till task A is not accomplished.
Total time to accomplish task A = 5 days
Total time to accomplish task B= 5 days
Expected time to accomplish task C = 5 days
If tasks B and C are mutually independent
expected time to complete the project = 5+5=10days
If task C depends on task B
Expected time to complete the project = 5+5+5 = 15 days.
Therefore
The expected completion time of the project is
(i)10 days if B&C are mutually independent
(ii)15 days if B and C are mutually dependent
To get more about probability visit to:
https://brainly.com/question/24756209
please help asap will give brainliest
Answer:
of course three units ..
The average woman's height is 65 inches with a standard deviation of 3.5 inches.
a.) Determine the z-score of a woman who is 70 inches tall. Round to the nearest tenth.
b.) Use a z-score table to determine how many women out of 10,000 would be taller than the 70 inch tall woman.
Answer:
Part a:
p(z=1.43) find 1.43 in z table that'll be the answer for part a
if the fourth term of an ap is 1 and sum of it first right term is 18 find the tenth term
please help me due today I will give brainiest
This is past due I need help will give brainlist
Answer:
A
Step-by-step explanation:
Order from least to greatest
11. 357
2. 1.02
13. .80
4. .002
15. .05
16. .40
Answer:
0.002 , 0.05 , 0.40 , 0.80 , 1.02 , 2 , 4 , 11 , 13 , 15 , 16 , 357
Step-by-step explanation:
11 , 357 , 2 , 1.02 , 13 , .80 , 4, .002 , 15 , .05 , 16 , .40
WILL MARK BRAINLIEST!!!
The production rate of a steel factory is declining due to old machinery. Over the last eight days production has dropped by 1.2 tons. What is the average rate of change in steel production over the eight days? Express the answer in tons per day.
A. +1.2
B. -1.2
C. +0.15
D. -0.15
Answer:
option D.
Step-by-step explanation:
average rate of change in steel production over the eight days=-0.15 tons per day
Step-by-step explanation:
The production rate of a steel factory is declining due to old machinery. Over the last eight days production has dropped by 1.2 tons.
Production is dropped by 1.2 tons, so its negative
Average rate of change = Change in production / number of days
Average rate of change = -1.2/ 8= -0.15
so sorry -0.15
complete the last four terms by dragging the missing value to correct locations in the expression
Answer:
Brainly does not have the correct answer listed as a choice - it should be [tex]2187y^{14}[/tex]
Step-by-step explanation:
Find the value of x in the parallelogram below.
Answer:
129
Step-by-step explanation:
the 2 angles together will equal 180 because that is half of a circle a circle is 360so what you do is subtract 180 minus 51 and get 129